Reclamation works at Malacca Tengah , Bandar Hilir

Reclamation works at Malacca Tengah , Bandar Hilir

2013 May
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G  

230G 230G 230G 230G
230G 230G 230G 230G

230G 230G 230G 230G

230G 230G 230G 230G

230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G

230G 230G 230G 230G

June 2013
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G

230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G 230G 230G
230G 230G    

 

Installation of the light at Project Boundary
230G 230G 230G 230G 230G

 

Jangka 1 Sand Pump dredger
230G 230G 230G 230G 230G

 

 

Malacca Reclamation  Bandar Hilir  PLOT A
230G 230G 230G 230G 230G

 

Malacca Reclamation  Bandar Hilir  PLOT A  loading sand
230G 230G 230G 230G 230G

 

230G 230G 230G
Malacca Reclamation  Bandar Hilir  PLOT A  loading sand Sand pumping with Jangka 1-45m deep Sand loading  at Masonite concession

230G 230G  
Sand loading Malacca reclamation project The team surveyor consultant from lion group